Toshiba ACE-tronics G9 ASD Installation And Operation Manual page 46

Adjustable speed drive
Hide thumbs Also See for ACE-tronics G9 ASD:
Table of Contents

Advertisement

LED/LCD Screen Installation Note
When installing the LED/LCD display module of the EOI ensure that the left side of the display is
inserted first with the top and bottom catches (see Phillips screws at underside of display) securely in
place. This ensures the proper alignment and electrical connection of the CNX connector of the LED/
LCD display module PCB. Gently hold the display in place while securing the Phillips mounting screw.
If improperly seated, the periphery of the LED/LCD display module will not be flush with the front panel
surface and the unit will not function properly.
36
ACE-tronics G9 ASD Installation and Operation Manual
Buy: www.ValinOnline.com | Phone 844-385-3099 | Email: CustomerService@valin.com

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents