This chapter provides the information necessary to install the KSU for the
Electra Elite 48 system. The technician should be familiar with this section
before installing any equipment.
Plan the installation before actually installing the system. Advanced
planning minimizes installation time, cost, and disruption of the customer
business activities.
2.1

Precautionary Information

Observe the following warnings during installation.
1.
Never install telephone wiring during a lightning storm.
2.
Never install telephone jacks in wet locations unless the jack
is specifically designed for wet locations.
3.
Never touch uninsulated telephone wires or terminals unless
the telephone line is disconnected at the network interface.
4.
Use caution when installing or modifying telephone lines.
2.2

Surveying the Customer Site

In most cases, a survey of the customer site is necessary to
determine the proper placement of the Main Distribution Frame
(MDF), the exact dimensions of the area selected for the MDF,
cabling requirements, and possible Intermediate Distribution
Frame (IDF) locations.