ABB ACS580MV Hardware Manual page 70

200 kw to 6300 kw, 6 kv to 11 kv
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

70 Electrical installation
1
M8 bolt
2
Dished washers (4 pcs. per terminal)
3
Flat washers (4 pcs. per terminal)
4
M8 nuts (2 pcs. per terminal)
5
Cable shoes
6
Support plate
Transformer terminal connections
The supply cables for the fan units of the transformer and the control cables are routed
through the cable lead-through in the side wall.
NOTICE
The required tightening torque for the internal transformer terminal connections
is 15 Nm. Use a torque wrench.
The PE busbar is connected with INU and TRU PE busbars through the side wall.
PE busbar connection
2
2
1
3
3
6
2
4
3
2
3
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents