Control Hub Daughter Board - ABB ACS580MV Hardware Manual

200 kw to 6300 kw, 6 kv to 11 kv
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

1. Stop, de-energize and ground the drive following the steps in section
the drive for maintenance
2. Switch off all miniature circuit breakers in the control compartment.
3. Unplug all fiber optic links on the daughter boards and fiber optic links Y1,Y2,Y3,Y4,
power supply connector (X1), signal connectors (X2) and the pressure tube.
4. Hold the control hub, loosen the 8 fixing screws on the mounting plate and remove the
module.
5. Install the new control hub in reverse order.
6. When the work is completed the drive can be started up again. See Chapter
Operation, Energizing and starting the

Control hub daughter board

The control hub daughter boards are mounted in slots on the control hub board.
1. Stop, de-energize and ground the drive following the steps in section
the drive for maintenance
2. Switch off all miniature circuit breakers in the control compartment.
3. Unplug all fiber optic links on daughter boards.
4. Loosen the screws of the retainer and remove it.
before you start the work.
drive.
before you start the work.
Maintenance 137
Shutting down
Shutting down