Installation checklist

Contents of this chapter

This chapter contains an installation checklist which you must complete before
commissioning can take place.
Safety
DANGER
High voltage!
Obey the instructions in chapter
or damage to the equipment can occur.
Before starting to work on the drive, make sure:
that the main and auxiliary power supply to the drive is switched off, locked out, and
tagged out
that the drive is dead
that safety ground connections are in place
that personal protective equipment is provided and used when required
that everyone involved is informed.
Before energizing the drive, make sure:
that all foreign objects are removed from the drive
that all internal and external covers are securely fastened and all doors are closed,
locked and / or bolted
that the release dials of safety switches are in the locked position.
Safety
instructions. If you ignore them, injury or death,
Installation checklist 85