Installing power and ground cables

Further information

See
ACS580MV Base frame & TEU layout design
Project-specific cable entry
Distance between the point of cable entry and the termination bars
Busbar and fastening hole dimensions
Busbar designations
See
ACS580MV Wiring Diagram
Conventions for cross-references and device identification

Preparing the cable entry and the cables

NOTICE
Risk of damage or malfunction!
Waste inside the cabinet can cause damage or malfunction.
If possible, do not cut cables inside the terminal compartment. Retrieve any waste which
accidentally dropped into the cabinet.

Determining the cable length

1
Determine the required length of a cable between the point of entry and the connection
point inside the cabinet.
2
Cut the cable to the required length before connection.

Preparing cables for entry plates

Prepare the cable termination as illustrated in the figure below.
for information on:
for information on:
Electrical installation 73