Mechanical installation

Contents of this chapter

This chapter describes the mechanical installation procedure of the drive.

Safety

All installation work must be carried out by qualified personnel according to the site and
equipment requirements and in compliance with the local regulations.

Examining the installation site

Examine the installation site (see the
The installation site is sufficiently ventilated or cooled to transfer away the drive
1)
losses.
The ambient conditions of the drive meet the specifications.
The wall behind the unit is of non-flammable material.
There is enough free space above the drive to enable cooling air flow, service and
maintenance. See the
The floor that the unit is installed on is of non-flammable material, as smooth as
possible, and strong enough to support the weight of the unit. Check the floor flatness
with a spirit level. The maximum allowed deviation from the surface level is 5 mm in
every 5 meters. Level the installation site, if necessary, as the cabinet is not equipped
with adjustable feet.
1)
The heat losses and ambient conditions are specified in the
Guideline.
ACS580MV Engineering
ACS580MV Base frame & TEU layout
Mechanical installation 59