Cable Requirements; Parallel Routing Of Power Cables; Terminal Sizes For Auxiliary And Control Connections - ABB ACS580MV Hardware Manual

200 kw to 6300 kw, 6 kv to 11 kv
Hide thumbs Also See for ACS580MV:
Table of Contents

Advertisement

66 Electrical installation

Cable requirements

For information on the requirements for power cables and the ground cable see the
ACS580MV Engineering Guideline
For information on the requirements for the auxiliary power cable and the control cables,
see Auxiliary power and control cables guideline.

Parallel routing of power cables

Cables between drive and motor can be laid in parallel. The number of cables laid in
parallel is limited by the number of entry holes of the entry plate.
For information on the supply voltages, see Rating label of the drive.

Terminal sizes for auxiliary and control connections

Terminal
X1:1
X1:3
X1:5
X1:7
X1:9
X1:11
X1:13
X1:15
X1:17
X1:19
X1:21
X1:23
X1:25
X1:27
X1:29
X1:31
X1:33
X1:35
X1:37
X1:39
X1:41
X1:43
X1:45
X1:47
X1:49
X1:51
Terminal
X4: N
X4: PE
X5: N
X5: PE
X6: N
X6: PE
Customer I/O terminal
Wire cross-section (mm
Solid wire
0.2...2.5 mm
Customer supply connection terminals
Wire cross section (mm
Solid wire
0.5...4 mm
0.5...4 mm
1.5...35 mm
2
)
Flexible wire
2
2
)
Flexible wire
2
2
2