GE AxiChrom 50 Operating Instructions Manual page 95

Columns
Table of Contents

Advertisement

5 Pour the slurry into the column (see Pouring slurry into the column, on page 74).
6 Fit the adapter and top plate onto the column (see Fitting the top plate and adapter,
7 Place a syringe (without plunger) onto the hydraulic chamber vent valve, and open
8 To pump liquid into the hydraulic chamber:
AxiChrom 50, 70 and 100 columns Operating instructions 28-9331-08 AG
on page 41).
NOTICE
Ensure that the full flow path is unrestricted when pumping
liquid into the column.
NOTICE
Insert the adapter into the mouth of the column tube at an
angle to ensure that no air is trapped in the column.
the vent valve.
For ÄKTApilot
ÄKTApilot: in the UNICORN System Control module choose Manual in the menu and
Flowpath:Columns :Col1_Col2_Packing.
5 Operation
5.3 Manual packing of the column
95

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Axichrom 70Axichrom 100

Table of Contents