Toshiba Q9 Plus Bypass ASD Installation & Operation Manual page 433

Hide thumbs Also See for Q9 Plus Bypass ASD:
Table of Contents

Advertisement

Sold
Customer Number: MAR450
MARKET MATERIALS, LLC
To:
C/O HENGEL BROTHERS, INC
2302 SOUTH AVENUE
LA CROSSE, WI 54601
Order
Order Date
0028835
05/04/17
Customer PO 2695-304
Order
Item #
Acknowledged By: _______________________________________ Date: ______________
Based on our Terms and Conditions.
Ship
To:
Sales Code
Ship Date
JJS
05/19/17
PO Release
Description/Notes
TO INSURE AN EXPEDIENT TROUBLE FREE
START-UP, WE RECOMMEND A REPRESENTATIVE
FROM THE ELECTRICAL CONTRACTOR AND
CONTROL SYSTEM BE PRESENT AT THE
START-UP. PRIOR TO START-UP, THE
FOLLOWING MUST BE COMPLETED:
--DRIVES ARE TO BE INSTALLED PER
MANUFACTURERS SPECIFICATIONS.
--LINE, LOAD AND CONTROL WIRIING MUST
BE IN SEPARATE CONDUITS.
--SPEED REFERENCE SIGNAL WIRING SHALL BE
A MINIMUM OF 18 AWG STRANDED SHIELDED
TWISTED PAIR, WITH SHIELD TERMINATED
AT THE POINT OF SIGNAL ORIGIN.
--LINE VOLTAGE MUST BE AVAILABLE.
--CONTROL SIGNALS MUST BE PRESENT AND
OPERABLE.
--MOTOR AND DRIVEN EQUIPMENT MUST BE
COUPLED AND READY TO OPERATE.
--REQUIRED ROTATION OF MOTOR MUST BE
KNOWN.
Customer Copy
Sales Order
Acknowledgement
Order No.:
Order Date:
Ship To Number: 000003
WTC ADMIN HVAC & LIGHTING BLD
PKG 2
111 SEVENTH STREET N
LA CROSSE, WI 54601
Ship Via
Misc Number PPD/ALLOW
Unit Price
Sub Total
Discount
Tax
Freight
Total
0028835
05/04/17
Page:
3
Terms
NET 30 DAYS
Extension
Continued ...

Advertisement

Table of Contents
loading

Table of Contents