Hitachi PRIMAIDE 1440 Instruction Manual page 190

Table of Contents

Advertisement

6.5
Drain Tubing
Primaide
Organizer
Primaide1410/1430
UV/DAD Detector
Primaide 1310
Column Oven
Primaide1210
Auto Sampler
Primaide1110
Pump
Clamp (P/N:8DD-1921)
When setting up eluent / waste tubings as below, follow the steps
① Place CLAMP SHEET (8DD-1095) as shown.
② Decide position of clamp (8DD-1920) and clamp (8DD-
1921).
Use the cutout of CLAMP SHEET.
③ Degrease the surface by ethanol etc...
④ Paste clamps.
⑤ Arrange eluent / waste pipings as shown.
(a) stacked in one block
Eluent
APPENDIX 1 - 18
Waste
C aution:
Do not tile to prevent backflow
Clamp Sheet (P/N:8DD-1095)
Clamp (P/N:8DD-1920)
C aution:
Do not tile to prevent backflow

Advertisement

Table of Contents
loading

Table of Contents