Installation Procedure - Hitachi PC-ARF Technical Catalogue

Table of Contents

Advertisement

5 Centralised remote controls
PSC-A16RS

5.4.2.6 Installation procedure

D A N G E R
Ensure to fix the centralised ON/OFF controller according to this manual. The incorrect installation will cause personal injury
due to the fall of the centralised ON/OFF controller
1 Insert the edge of the screwdriver into the slot parts at the bottom of the case, push and turn the screw-driver and
remove the control part from the power supply part. Do not insert the screwdriver into the nail near the slot part, or the
nail will be damaged.
Power Supply Part
Control part
Slot part
2 Attach the power supply part to the switch box.
3. Attach the control part onto the power supply part. At first, attach the upper side, and then the lower side.
397
TCGB0106 rev.0 - 12/2014
Slot Part
Approx. 6 mm
Screw
driver
Do not run the power line and
the control line through the
same conduit tube
Screw driver
Power line
(2 pcs.)
Screw (x2)
Switch Box with cover
(Field supplied)
Figure seen from bottom side
Screw
driver
Control line
Nail
5

Advertisement

Table of Contents
loading

Table of Contents