Power Off - NEC Express5800 User Manual

N8100-1665f/1666f/1667f
Hide thumbs Also See for Express5800:
Table of Contents

Advertisement

2-22 General Description

Power Off

Follow the procedure below to power off the server. If the power cord of the server is connected to a
UPS, refer to the manual that comes with the UPS or the manual for the application that controls the
UPS.
IMPORTANT: Always allow POST to complete before turning off the
server.
1.
Shut down the OS.
2.
Press the POWER/SLEEP switch on the front of the server.
The POWER/SLEEP lamp goes out.
3.
Power off peripheral devices.
NOTE:
not select "Standby" in the Windows shutdown menu.
The standby function of Windows Server is not available. Do

Advertisement

Table of Contents
loading

This manual is also suitable for:

T120b-mExpress5800/t120b-m

Table of Contents