Connecting To Ahc2001 Cpu - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

3.5.17

Connecting to AHC2001 CPU

■1. Communication settings
Make the communication settings by operating the Smart Loader Package (SLP-D50/SLP-H21)of the temperature
controller.
*1
Transmission speed
*2
Communication mode
Data bit
Parity bit
Stop bit
*3
Station address
*1
*2
*3
*4
3.5.18
Connecting to AHC2001 SCU
■1. Communication settings
Make the communication settings by operating the Smart Loader Package (SLP-D50/SLP-H21)of the temperature
controller.
*1
Transmission speed
*1
Data bit
*1
Parity bit
*1
Stop bit
Half duplex/Full duplex
Space sending
*3
Protocol setup
*1
*2
*3
3 - 70
3.5 Control Equipment Side Setting
Item
Adjust the settings with GOT settings.
Set this item to 1: CPL.
Select the station address without overlapping with that of other units.
The station address for AHC2001 ranges from 1 to 127. However, use station address from 1 to 15, which are the range for
DMC50.
Item
*2
Adjust the settings with GOT settings.
Set this item to 0: Half duplex.
Set this item to 2: CPL.
9600bps, 19200bps, 38400bps, 57600bps
0: MODBUS
1: CPL
8bits (fixed)
Even (fixed)
1bit (fixed)
*4
1 to 15
9600bps, 19200bps, 38400bps
7bits, 8bits
0: None, 1:Even, 2: Odd
1bit, 2bits
0: Half duplex, 1: Full duplex
0 (fixed)
1 to 30
Set value
Set value

Advertisement

Table of Contents
loading

Table of Contents