Assembly Notes
♦
Plug in the power supply/ballast cable and the lamp control cables to their connectors on the ballast.
♦
Position the bottom of the ballast in the slots in the chassis. Make sure the two screw holes in the
ballast align with the threaded standoffs on the wall of the chassis.
♦
Install and torque the two M3x8 Torx screws to 6 in/lbs (.68 Nm).
TDP-MT8 Service Guide
9