ABB i-bus KNX Product Manual page 153

Fan coil actuators fca/s
Hide thumbs Also See for i-bus KNX:
Table of Contents

Advertisement

®
ABB i-bus
KNX
Commissioning
Function Time on OFF
Options:
This defines the Time function on Fan OFF.
None: No Time function is executed.
Switching delay: The fan is switched off after this delay.
Minimum time: The fan remains OFF for at least this time.
Selection of option Switching delay:
Selection of option Minimum time:
Enable communication object
"Forced operation" 1-bit
Options:
Yes: A 1 bit Forced operation communication object is enabled.
None
Switching delay
Minimum time
Dependent parameter:
Time in s [1...65,535 x 0.1]
1...20...65,535
Options:
The fan is switched off after this delay.
Dependent parameter:
Time in s [1...65,535]
1...20...65,535
Options:
The fan remains OFF for at least this time.
No
Yes
Dependent parameters:
Forced operation on object value
Options:
0
1
0: Forced operation is activated by a telegram with value 0.
1: Forced operation is activated by a telegram with value 1.
Reaction on forced operation
Options:
Unchanged
OFF
ON
This parameter defines how the fan should respond to a forced operation.
FCA/S 1.x.x.1 | 2CDC508134D0202 151