Figure 3-137 Installing Cover Battery; Installing The Chs2Ug B Small Batt Box On The 9.5" Chs2Ug B Chassis - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

8.3
3-104
9.
Insert tabs on cover into holes on CHSG LARGE BATT BOX. Slide
the cover left until seated and tighten the screw.
Installing the CHS2UG B SMALL BATT BOX on the 9.5" CHS2UG B
Chassis
An optional, CHS2UG B SMALL BATT BOX can be installed to provide external
battery power to the CHS2UG GW and CHS2UG B chassis during a power
failure. The short-term battery box will power the system for approximately 10
minutes.
8.3.1
CHS2UG B SMALL BATT BOX Installation
1.
Power down the CHS2UG GW or CHS2UG B chassis.
WARNING
2.
Disconnect AC power cable from rear of chassis.
3.
Align the Small Battery cable assembly with the grooves underneath
the Base (CHS2UG B) chassis. Use the two M3 x 8 screws provided
to secure the cable assembly in place (refer to
Battery Cable Assembly on page

Figure 3-137 Installing Cover Battery

Ensure the CHS2UG GW or CHS2UG B chassis is
powered OFF.
Figure 3-138 Installing
3-105).
Installing the SV9100 Chassis
Issue 2.0

Advertisement

Table of Contents
loading

Table of Contents