Figure 5-87 Ribbon Cable Installed; Figure 5-88 8Lkd (Ld)-L Unit Installed - NEC Univerge SV9100 System Hardware Manual

Hide thumbs Also See for Univerge SV9100:
Table of Contents

Advertisement

Issue 2.0
SV9100 System Hardware Manual
7.
Plug ribbon cable on back of 8LKD (LD)-L UNIT into
connector until pressure is felt.
8.
Press down on the black bar to lock the cable into place
(refer to

Figure 5-87 Ribbon Cable Installed

9.
Align the projections on the bottom of the 8LKD (LD)-L UNIT
with the guide holes on top of the multiline terminal.
10.
Slide the 8LKD (LD)-L UNIT toward the keypad buttons until
snug (refer to
Figure 5-87 Ribbon Cable Installed on page
Guide
Guide
Figure 5-88 8LKD (LD)-L UNIT

Figure 5-88 8LKD (LD)-L UNIT Installed

5-85).
Projection
(One Each Side)
Installed).
5-85

Advertisement

Table of Contents
loading

Table of Contents