Download Print this page

Dell PowerVault 124T DLT VS160 User Manual page 3

Autoloader
Hide thumbs Also See for PowerVault 124T DLT VS160:

Advertisement

Installing the Autoloader: Dell PowerVault 124T DLT VS160 Autoloader User's Guide
Back to Contents Page
Installing the Autoloader: Dell™ PowerVault™ 124T DLT VS160
Autoloader User's Guide
Installation Overview
Installation Preparation
SCSI Bus Requirements
Accessories
Choosing a Location
UL Requirements
Bar Code Reader
Product Overview
Installation Overview
Installing the autoloader consists of the following steps, which are explained in more detail later in this section:
1. Prepare to install your new Dell PowerVault 124T DLT VS160 autoloader (see
2. Identify the proper SCSI bus types (see
3. Identify the accessories that come with the autoloader (see "Accessories").
4. Install the autoloader in a computer rack near the host server. If installing a rack mount unit, refer to your rack
Installation Guide.
5. Shut down or turn off the server and all devices attached to the server (see
6. Attach the SCSI cable to the autoloader and server's SCSI host adapter (see
7. Attach the power cable to the autoloader and plug in the power cable to the nearest power outlet (see
SCSI and Power
8. Set the SCSI ID for the autoloader (see
9. Set up the host and verify the connection (see
Installation Preparation
Before you install your new Dell PowerVault 124T DLT VS160 autoloader, unpack it carefully and inspect it for any damage
that might have occurred during shipping. The Getting Started Guide included in the packaging describes all the necessary
information to unpack and inspect your autoloader correctly. Locate the Getting Started Guide and follow the directions.
Ensure that the work area is free from conditions that could cause electrostatic discharge (ESD). Discharge static electricity
from your body by touching a known grounded surface, such as your computer's metal chassis.
file:///T|/htdocs/stor-sys/124T/en/124tvs16/install.html[12/5/2012 10:25:55 AM]
"SCSI Bus
Cables"). Power the autoloader on to ensure it passes the Power-on Self-Test (POST).
"Setting the SCSI
Unpacking the Autoloader
Identifying Product Components
Connecting the SCSI and Power Cables
Preparing the Host and Verifying the Connection
Installing the Device Drivers
Enabling LUN Support in Linux
Enabling LUN Support in Netware
Requirements").
ID").
"Preparing the Host and Verifying the
"Installation
Preparation").
"Connecting the SCSI and Power
"Connecting the SCSI and Power
Connection").
Cables").
Cables").
"Connecting the

Advertisement

loading