Fccs Network Connection Test; Station-To-Station Connection Test (Via Fccs); Fccs Call Origination Test; Figure 6-7 Fusion Link-Test Results - NEC NEAX 2400 IPX Manual

Fusion network
Hide thumbs Also See for NEAX 2400 IPX:
Table of Contents

Advertisement

POST INSTALLATION TEST

FCCS Network Connection Test

Make sure that the LYR LED flashes at 60-INT.
Note:
When the FCH is a "Root Bridge", the LOAD LED remains ON.
STEP 4: Return Mode to 8 (standard setting) when the test is complete.
STEP 5: Initialize the FCH (PA-FCHA) card using the MB switch.
Be sure to initialize the FCH (PA-FCHA) card after changing the setting of the Mode Switch.
Note:
3. FCCS Network Connection Test
This section explains how to perform the following connection tests within the Fusion network:

Station-to-Station Connection Test (via FCCS)

ATTCON Connection Test (via FCCS)
Line (LC, ELC, DLC card) Connection Test (via FCCS)
3-party Conference Trunk Function Test (via FCCS)
3.1 Station-to-Station Connection Test (via FCCS)
Perform the station-to-station connection test by following the procedures below and by referring to
Figure
6-8:
3.1.1

FCCS Call Origination Test

STEP 1: Using the MBCT command, make busy all trunks in the route except the trunk to be tested.
STEP 2: Lift the handset of STN A in Node A.
CHAPTER 6
Page 150
Revision 1.0
When the result of test
is OK, the LYR LED
flashes.
LYR
Flash
Remains ON
LB
when available
for Ethernet
LOAD
Remains ON
when ready to broadcast
Front View
data packets
Note

Figure 6-7 Fusion Link-Test Results

NDA-24299
FCH (PA-FCHA) card
EST3
Send
Receive Polarity of
EST2
pair-wire is normal
EST1
Receive
EST0
Link is
established
MB
M N T
M o de
8
D T I
FC H
Fron t V ie w
Check

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents