Figure 4-12 Connecting 10 Base-T Cables (Example) - NEC NEAX 2400 IPX Manual

Fusion network
Hide thumbs Also See for NEAX 2400 IPX:
Table of Contents

Advertisement

INSTALLATION
Connecting Cables
When dual FCH is provided for the HUB dedicated to each internal LANI card (LANI-A: in Slot
00 of each CPR), connect FCH#0 to HUB#0 and FCH#1 to HUB#1.
When your system also uses the external LANI cards (LANI-B in Slot 03 of each CPR), prepare
another set of FCH cards for the HUB dedicated to the external LANI cards. Then, if the FCH is in
dual configuration, connect one FCH to the HUB for No. 0 system of the external LANI, and the
other to the HUB for the No. 1 system of the external LANI.
Figure 4-12
1 of the 1 IMG system.
2
C onnect tw o H U B cards using
a 10 B A S E -T cross cable.
(W hen H U B is in dual
configuration.) N ote
1
C onnect the L A NI and the
H U B card using a 10 B A S E -T
straight cable. E ight
10 B A S E -T connectors
(T P 0-X - TP 7-X ) are
-
furnished on the front edge
of the H U B card. U se one of
the connectors.
This step can be skipped when dual LANIs (LANI-A and LANI-B) are used for each CPU and FCH is
Note:
provided in a dual configuration.
CHAPTER 4
Page 50
Revision 1.0
shows an example of a HUB in a dual configuration and the FCH card mounted in PIM
3
C onnect H U B and FC H using a
10 B A S E -T straight cable.
R efer to figures listed on the
follow ing pages.

Figure 4-12 Connecting 10 BASE-T Cables (example)

NDA-24299
D TI
D TI
FC H
2
1
N ote
LA N I
LA N I
N ote
A T T E N T IO N
C onten ts
Static Sen sitive
H and ling
Precau tions R eq uired
3
G T
G T
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents