POST INSTALLATION TEST
FCCS Network Connection Test
3.2.1

ATTCON Call Origination Test

STEP 1: Dial the operator access code (normally "0"), from STN A in Node A.
STEP 2: Confirm that the ATT lamp flashes and ringer sounds at each ATTCON in Node B.
STEP 3: Answer the call by pressing the ATND key.
STEP 4: Confirm the speech condition is sufficient (no noise, not one-party speech, etc.).
STEP 5: Release the call by pressing the CANCEL key.
STEP 6: Replace the handset of STN A in Node A.
3.2.2

ATTCON Call Termination Test

STEP 1: Press a LOOP key on an ATTCON in Node B.
STEP 2: Dial the telephone number of STN A.
STEP 3: Confirm the ringer sounds properly at STN A.
STEP 4: Answer the call and confirm the speech condition is sufficient (no noise, not one-way speech, etc.).
STEP 5: The operator at the ATTCON releases the call by pressing the CANCEL key.
STEP 6: Replace the handset of STN A in Node A.
Operator Access
Node A (Self-Node)
Code "0"
STN A
LC
LSTN: 410000
STN: 2000
LSTN: Logical Station Number STN: Physical Station Number

3.3 Line (LC, ELC, DLC Card) Connection Test (via FCCS)

Perform the Line (LC, ELC, DLC Card) connection test by following the procedures below and by referring
to
Figure
6-10:
CHAPTER 6
Page 152
Revision 1.0

Figure 6-9 ATTCON Connection Test (origination) via FCCS

FCCS
NDA-24299
Node B
ATI
Check
Check
ATTCON