Figure 4-15 Examples Of Ethernet Cable Connection-Fch In Pim2 (1-Img System) (1/2); Table 4-8 Connection Of 10 Base-T Cables To Fch Card(S) In Pim2 Of 1-Img - NEC NEAX 2400 IPX Manual

Fusion network
Hide thumbs Also See for NEAX 2400 IPX:
Table of Contents

Advertisement

INSTALLATION
Connecting Cables
Figure 4-15
shows some typical examples where 10 BASE-T cables are connected to the FCH card(s) mounted
in PIM2 of 1-IMG system, under the conditions in

Table 4-8 Connection of 10 BASE-T Cables to FCH Card(s) in PIM2 of 1-IMG

Configuration
Pattern 1
Pattern 2
Pattern 3
Pattern 4
Note 1:
Cables contained in each cable unit are as follows:
SR1201 ETIF CAU-C: UTP CTG5 ST CA-M, UTP CTG5 ST CA-J
SR1201 ETIF CAU-DC: UTP CTG5 ST CA-K, UTP CTG5 ST CA-J, UTP CTG5 CRS CA-F
Note 2:
The cables cited in
HUB
FCH
(PA-M96)
(PA-FCH A)
= 10 BASE-T Connector
Use 10 BASE-T connectors.
TP7-X
10 BASE-T
TP6-X
TP5-X
TP4-X
TP3-X
TP2-X
TP1-X
TP0-X
F R O N T V IE W
F R O N T V IE W

Figure 4-15 Examples of Ethernet Cable Connection-FCH in PIM2 (1-IMG System) (1/2)

CHAPTER 4
Page 54
Revision 1.0
Configuration
of CPU
of LAN
Single
Single
Dual
Single
Single
Dual
Dual
Dual
Figure 4-15
can be used in the 1-IMG system only.
<FC H in PIM2 (Pattern 1)>
FAN U
U TP C TG 5 ST C A -M
00
01
02
03
U TP C TG 5 S T C A -J
00
01
02
03
BASEU
Table
4-8:
Used Cable Unit
(Note 1, Note 2)
SR1201 ETIF CAU-C × 1
SR1201 ETIF CAU-C × 1
SR1201 ETIF CAU-DC × 1
SR1201 ETIF CAU-C × 2
SR1201 ETIF CAU-C × 2
SR1201 ETIF CAU-DC × 2
<FC H in PIM2 (Pattern 2)>
TO PU
PIM 3
PIM 2
PIM 1
U TP C TG 5 ST C A -M
PIM 0
04 05
06
BSC M
LPM
04 05
06
U TP C TG 5 S T C A-J
NDA-24299
Number of HUB/
HUB× 1, FCH× 1
HUB× 2, FCH× 2
HUB× 2, FCH× 2
HUB× 2, FCH× 2
Contents
Static S ensitive
Handling
Precautions R equired
TO PU
PIM 3
U TP C TG 5 S T C A-K
PIM 2
FANU
PIM 1
PIM 0
U TP C TG 5 C R S C A-F
00
01
02
03
04 05
06
BSCM
LPM
00
01
02
03
04 05
06
BASEU
FCH
ATTENTIO N

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents