When 2U Power Distribution Unit Is Installed (For Regions Other Than Emea&I) - Fujitsu ETERNUS DX80 S2 User's Manual & Installation Instructions

Disk storage system
Hide thumbs Also See for ETERNUS DX80 S2:
Table of Contents

Advertisement

Chapter 4 Connecting Cables
4.5 Power Cord Connection
7
Turn the main line switch of the power distribution unit to the ON position (marked "|").
Make sure all of the main line switches are in the ON position.
Main line switch
AC power is supplied to an enclosure.
For the controller enclosure, the POWER LED on the power supply unit blinks green.
For the drive enclosure, the POWER LED on the power supply unit and the LINE LED on the front
emit green lights and the fan revolves at high speed for 30 seconds.
4.5.3
When 2U Power Distribution Unit is Installed (For Regions other than EMEA&I)
The following section explains how to connect a power cord when a Power distribution unit for DX80 S2/DX90
S2 (AC200-240V, 2U, Max 6 enclosures connection) is installed.
This section explains the connection procedure for power distribution units (AC200-240V, 2U, Max 6
enclosures connection). This procedure can also be applied for Power distribution unit for DX80 S2/DX90 S2
(AC200-240V, 2U, Max 8 enclosures connection).
To help with power cord management and prevent incorrect connections, attach labels to the power cords
and make a note of connection origins and destinations.
ETERNUS DX80 S2/DX90 S2 Disk storage system User's Guide -Installation-
83
Copyright 2013 FUJITSU LIMITED
End of procedure
P3AM-4832-07ENZ0

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eternus dx90 s2

Table of Contents