Battery Pack Installation; Figure 2-11 6270 Oeu Wall Mount Installation - ABB XSeries G4 6200 User Manual

Flow computer
Table of Contents

Advertisement

Step-by-step instructions
1) Using the instructions supplied with the mounting kit, attach the bracket to
2) Prepare the wall surface for mounting, and mount the enclosure to the wall.

2.2.8 Battery Pack Installation

If the 6270 OEU is used (see Figure 2–12) and is configured to include a battery
pack, use the following procedures.
The battery is packed and shipped separately from the 6270 OEU. Before
installation, inspect the power cables that are located inside the 6270 OEU where
they terminate on the battery pack and the connector for breakage.
Before beginning, review the procedures and the materials required for
installation.
Page 2–12
Figure 2–11 6270 OEU wall mount installation
the back of the enclosure unit.
To extend the life of the battery pack, fully charge the battery
prior to installation. Systems using solar panels may not fully
charge the battery. Charging the battery fast will remove the
oxide buildup and will improve the life of the battery.
Do not over charge the battery pack.
2104349 rev. AD

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xseries g4 6201ex

Table of Contents