Diagnostics
3.1 Diagnostics via LEDs
LED
Color
DP
PROFIdrive
cyclic
operation
Green
Red
OPT
(OPTION)
Green
Red
RDY and DP
Red
RDY and OPT Orange
162
State
Off
Cyclic communication has not (yet) taken place.
Note:
The PROFIdrive is ready to communicate when
the Control Unit is ready to operate (see LED
RDY).
Continuous
Cyclic communication is taking place.
light
Flashing
Full cyclic communication has not yet taken
light
place.
0.5 Hz
Possible causes:
The controller is not transferring any
setpoints.
During isochronous operation, no global
control (GC) or a faulty global control (GC) is
transferred by the controller.
Flashing
PROFIBUS master is sending wrong
light
parameterization/configuration data
0.5 Hz
Flashing
Cyclic bus communication has been interrupted
light
or could not be established
2 Hz
Off
Electronic power supply is missing or outside
permissible tolerance range.
Component is not ready.
Option board not installed or no associated drive
object has been created.
Continuous
Option board is ready.
light
Flashing
Depends on the option board used.
light
0.5 Hz
Flashing
There is at least one fault of this component.
light
The Option Board is not ready (e.g. after
2 Hz
switching on).
Flashing
Bus error - communication has been interrupted
light
2 Hz
Flashing
Firmware update in progress for connected
light
Option Board CBE20
0.5 Hz
Description, cause
Commissioning Manual, (IH1), 01/2011, 6SL3097-4AF00-0BP1
Remedy
Adapt configuration between
master/controller and CU
Remedy fault
Check power supply and/or
component
Remedy and acknowledge
fault
Remedy fault
-
Commissioning Manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents