Epson RC620 CU Manual page 213

Robot controller
Hide thumbs Also See for RC620 CU:
Table of Contents

Advertisement

PCI Board
(1) Insert the PCI Board into the PCI-BPB slot and secure using a screw.
Installation
NOTE
(2) Insert the board holder assembly into
(3) Loosen the screw holding the PCI
NOTE
(4) Place the top panel and secure it using 10 screws.
(5) If you disconnected the external cables from the PCI Board, connect them again.
(6) Plug in the power connector.
RC620 Rev.8
Maintenance 6. Maintenance Parts Replacement Procedures
Be sure to tighten the screw with proper tension. Otherwise, the screw hole will
be broken.
the hole of the side panel (Right) and
secure it using a screw.
Board.
Put the PCI Board in position and set
the screw.
Make sure that the PCI Board is
firmly placed.
Controller starts properly without any vibration or abnormal noise.
Turn ON the Controller and make sure that the
197

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rc620 seriesRc620 du

Table of Contents