Siemens HiPath 3000 Series Service Documentation page 667

Table of Contents

Advertisement

Nur für den internen Gebrauch
Procedure
Step
1.
Plug in the power supply cable for the system cabinet(s).
Note (for Brazil only): The AC power of a system cabinet is internally equipped
with transient overvoltage protection up to approx. 2kV. Since additional lightning
protection is prescribed for Brazil, the AC power of the system cabinet(s) must be
conducted through the outlet strip with overvoltage protection (part number
C39334-Z7052-C33). In this way, transient overvoltage protection is guaranteed
up to approx. 4 kV.
2.
Position all LUNA2 power supply switches to "DC-ON".
Note: Startup does not begin until the switches on all LUNA2 units are in "DC-ON"
position.
3.
Monitor the RUN LED of the CBSAP. The individual steps of the system boot
(Table 5-2) can be observed this way.
Run LED HiPath 3800
The CBSAP has a RUN LED that indicates the system status.
Table 5-2
RUN LED - LED Status Meaning
RUN LED
Off
On
Off
On
Off
for 0.1 s
Flashing
0.5 s on/0.5 s off
Flashing
0.1 s on/0.1 s off
1
The flashing rhythm depends on the load. The higher the system load the slower the flashing rhythm.
The HiPath 3800 is ready when the date "1. JAN 00" and the time "00:00" appear in
>
the display on the system telephone.
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation
No power
Reset switch pressed briefly
Reset switch held down for more than 5 seconds (LED is extinguished
to acknowledge that a reload has begun)
System boot
Load operation: APS in SDRAM, loadware, and card data
Normal operating state (zero load)
MMC removed or defective
Activity
Meaning
1
start_h3.fm
Starting Up HiPath 3000
Starting Up HiPath 3800
5-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents