11.4.9.11

Verifying that backup signal is released when STALARM is reset

1.
Set
2.
Set
3.
Use default value for
4.
Use default value for time delay backup trip
5.
Leave the inputs for CB close inactivated. These signals should not influence.
6.
Apply START signal at t=0s, and after 1.5 s apply the current above the set
7.
Check that STALARM signal is set after 1.0s and backup trip is blocked.
8.
Reset START signal after 3.5s, ensure that STALARM reset immediately.
9.
Set START after 3.6s, ensure that backup trip is set after
(3.750 s).
11.4.9.12
Test of
1.
Set
2.
Set
3.
Set
4.
Use default value for
5.
Use default value for time delay backup trip
6.
Use default value for time delay re-trip
7.
Leave the inputs for CB close inactivated. These signals should not influence.
8.
Apply START signal, and after 0.200 s apply the current above the set
9.
Check that STALARM does not come and that re-trip TRRET is instantly set at 0.200s
while the backup trip TRBU set only when
11.4.9.13
Test of
1.
Set
2.
Set
3.
Set
4.
Use default value for
5.
Use for example the default value for time delay backup trip
6.
Use for example the default value for time delay retrip
7.
Leave the inputs for CB close inactivated. These signals should not influence.
8.
Apply START signal, and after 0.200 s apply the current above the set
9.
Check that STALARM does not come and that both re-trip TRRET and backup trip TRBU
comes instantly at 0.200 s (that is, as soon as current is given to the function).
11.4.9.14

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.4.10

Stub protection STBPTOC

Prepare the IED for verification of settings outlined in Section
settings".
Logical signals for STBPTOC protection are available on the local HMI underMain menu/
Settings/IED Settings/Current protection/Stub(PTOC,50STB)/STBPTOC:x
Bay control REC670
Commissioning manual
StartMode = FollowStart .
FunctionMode = Current .
tStartTimeout = 1.0 s.
FollowStart&Mode behaviour
StartMode = FollowStart&Mode .
FunctionMode = Current .
RetripMode = UseFunctionMode .
tStartTimeout = 1.0 s.
FollowStart behaviour
StartMode = FollowStart .
FunctionMode = Current .
RetripMode = UseFunctionMode .
tStartTimeout = 1.0 s.
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
t2 = 0.150 s.
t2 backup trip delay has expired
t2 = 0.150 s.
t1 = 0.000 s.
t2 expires at 0.200 + 0.150s.
t2 = 0.150 s.
t1 = 0.000 s.
TESTMODE setting to Off .
"Preparing the IED to verify
Section 11
GUID-49CA34B6-5AE9-4E45-9F4E-33DA5F626209 v1
IPh> value.
GUID-D68675FC-2533-4D6F-A26B-E1611FB7B32A v1
IPh> value.
GUID-E3FFFAD0-C9E9-4EAF-8418-314E9D475EDA v1
IPh> value.
M12104-72 v5
M14922-2 v8
109

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents