Completing The Test; Voltage Based Delta Supervision Delvspvc; Verifying The Signals And Settings - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
Checking the operation of MAINFUF and PILOTFUF
1.
Simulate normal operation conditions with three-phase voltage on the main fuse group
and the pilot fuse group. Ensure the values are equal to their rated values.
2.
Decrease one of the three-phase voltages on main fuse group or pilot fuse group. The
voltage change must be greater than the set value for
MAINFUF or PILOTFUF signals are activated without any time delay.
3.
Set normal conditions as mentioned in step 1. MAINFUF or PILOTFUF signals should reset.
4.
Set
5.
Apply three-phase voltages with the value slightly below
6.
Decrease one of the three-phase voltages on main fuse group. The voltage change must
be greater than the set value for
7.
After more than 5 seconds increase the measured voltage back to the value slightly below
USealIn level. MAINFUF signal should not reset.
8.
Slowly increase measured voltage to the value slightly above
resets.
9.
Record the measured voltage and compare with the set value
11.8.3.1

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.8.4

Voltage based delta supervision DELVSPVC

Prepare the IED for verification of settings outlined in Section
settings".
11.8.4.1

Verifying the signals and settings

Make sure that the function is connected to SMAI function with U3P signal.
Delta supervision function has 6 different modes of operation. Proceed as follows to test the
function in a particular mode.
1.
Set the following parameters:
2.
Set the constant voltage input of UL1 = 63.5V at 0° and UL2 = 63.5V at 120° and UL3 at
63.5 -120° secondary at rated frequency.
3.
Based on the mode of operation, carry out the following changes on input condition of
Step
Each mode is given for increase and decrease operation. (3-a and 3-b)
Bay control REC670
Commissioning manual
SealIn to On , UD>MainBlock to 20% of UBase and USealIn to 70% of UBase .
Operation = On
MeasMode = Phase-to-ground
Umin = 10% of UBase
DelU> = 50% of UBase
DelUang> = 10°
DeltaT = 2
tHold = 100
2
to detect start condition.
© Copyright 2017 ABB. All rights reserved
Ud>MainBlock or Ud>PilotAlarm .
Ud>MainBlock . MAINFUF signal is activated.
Testing functionality by secondary injection
USealIn level.
USealIn until MAINFUF signal
USealIn .
GUID-38A57549-E6BF-46CB-ADFB-79305684EB67 v1
TESTMODE setting to Off .
GUID-FBFEC9C5-1B76-4688-A00D-9EEB33326966 v1
"Preparing the IED to verify
GUID-B05EE7E5-2360-4036-991A-00747C47A625 v2
Section 11
139

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents