1MRK 511 403-UEN E
6.
Measure the time delay for the TR1 signal and compare it with the set value.
7.
Check the inverse time delay by injecting a voltage corresponding to 1.2 × U1>.
8.
Repeat the test to check the inverse time characteristic at different over-voltage levels.
9.
Repeat the above described steps for Step 2 of the function.
11.5.2.2

Extended testing

1.
The tests above can be repeated for
11.5.2.3

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.5.3

Two step residual overvoltage protection ROV2PTOV

Prepare the IED for verification of settings outlined in Section
settings".
11.5.3.1

Verifying the settings

1.
Apply a single-phase voltage either to a single-phase voltage input or to a residual
voltage input with the start value below the set value
2.
Slowly increase the value until ST1 appears.
3.
Note the operate value and compare it with the set value.
4.
Decrease the voltage slowly and note the reset value.
5.
Set and apply a 20% higher voltage than the measured operate value for one phase.
6.
Measure the time delay for the TR1 signal and compare it with the set value.
7.
Check the inverse time delay by injecting a voltage corresponding to 1.2 × U1>.
( )
t s
IECEQUATION2429 V1 EN-US
where:
t(s)
k1
U
U1>
8.
Repeat the test for Step 2 of the function.
Bay control REC670
Commissioning manual
For example, if the inverse time curve A is selected, the trip signals TR1
and TRIP operate after a time corresponding to the equation:
k
1
=
U
1
>
U
1
Operate time in seconds
Settable time multiplier of the function for step 1
Measured voltage
Set start voltage for step 1
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
2 out of 3 and for 3 out of 3 operation mode.
"Preparing the IED to verify
U1> .
Section 11
GUID-BE4B4A36-CCEE-4020-B7DC-6A83A43D11F5 v2
TESTMODE setting to Off .
SEMOD54358-3 v7
SEMOD54358-35 v11
(Equation 25)
M13806-43 v6