ABB Relion 670 Series Commissioning Manual page 8

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Table of contents
Section 5
Configuring the IED and changing settings.................................................. 55
5.1
Overview............................................................................................................................................ 55
5.2
Configuring analog CT inputs....................................................................................................... 55
5.3
Supervision of input/output modules........................................................................................ 56
Section 6
6.1
Entering settings............................................................................................................................. 57
6.1.1
Entering SPA settings................................................................................................................. 57
6.1.2
Entering IEC settings.................................................................................................................. 57
6.2
Verifying the communication........................................................................................................ 58
6.2.1
Verifying SPA communication.................................................................................................. 58
6.2.2
Verifying IEC communication................................................................................................... 58
6.3
Fiber optic loop................................................................................................................................ 58
6.4
Section 7
7.1
Communication via the rear ports ...............................................................................................61
7.1.1
LON communication................................................................................................................... 61
7.1.2
The LON Protocol........................................................................................................................ 62
7.1.3
Hardware and software modules.............................................................................................62
7.2
Optical budget calculation for serial communication with LON ...........................................64
Section 8
8.1
Overview............................................................................................................................................ 65
8.2
Setting the station communication.............................................................................................65
8.3
Verifying the communication........................................................................................................ 65
Section 9
communication................................................................................................. 67
9.1
Overview............................................................................................................................................ 67
9.2
Setting the PMU station communication (PMU Report)..........................................................67
9.3
Setting the PMU station communication (PMU configuration)............................................. 67
9.4
Setting the TCP/UDP client communication............................................................................. 68
9.5
Verifying the communication.........................................................................................................71
9.5.1
Verifying the IEEE C37.118/1344 TCP communication..........................................................71
9.5.2
Verifying the IEEE C37.118/1344 UDP communication.........................................................77
9.6
Optical budget calculation for PMU - PDC communication.................................................... 78
Section 10 Testing IED operation...................................................................................... 79
10.1
Preparing for test.............................................................................................................................79
10.1.1
Requirements............................................................................................................................... 79
10.1.2
Preparing the IED to verify settings........................................................................................ 80
10.2
Activating the test mode................................................................................................................ 81
10.3
Preparing the connection to the test equipment......................................................................81
10.4
Connecting the test equipment to the IED.................................................................................82
10.5
Releasing the function to be tested.............................................................................................83
10.6
Verifying analog primary and secondary measurement..........................................................84
2
© Copyright 2017 ABB. All rights reserved
Bay control REC670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents