Completing The Test; Metering; Pulse-Counter Logic Pcfcnt; Function For Energy Calculation And Demand Handling Etpmmtr - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
4.
Compare the harmonic amplitude level value with the set warning limit value.
5.
Continue to inject the same level of harmonics level until the THDALM signal appears and
note down the time from THDWRN set to THDALM set.
6.
Compare the noted time value with the set time limit value of alarm.
Verifying the warning and alarm time limit of individual harmonic distortions
WrnLimit#HD and tDelayAlm#HD (where # = 2
1.
Supply the IED with voltage at rated value.
2.
Apply 2
3.
Slowly increase the harmonic amplitude until the 2NDHDWRN signal appears.
4.
Compare the harmonic amplitude level value with the set warning limit value.
5.
Continue to inject the same level of harmonics level until the 2NDHDALM signal appears
and note down the time from 2NDHDWRN signal set to 2NDHDALM signal set.
6.
Compare the noted time value with the set time limit value of alarm.
7.
Repeat Steps
11.12.10.2

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.13

Metering

11.13.1

Pulse-counter logic PCFCNT

The test of the Pulse-counter logic function PCFCNT requires the Parameter Setting tool in
PCM600 or an appropriate connection to the local HMI with the necessary functionality. A
known number of pulses with different frequencies are connected to the pulse counter input.
The test should be performed with settings
function blocked or unblocked. The pulse counter value is then checked in PCM600 or on the
local HMI.
11.13.2
Function for energy calculation and demand handling
ETPMMTR
Prepare the IED for verification of settings as outlined in section "Overview " and
section "Preparing for test" in this chapter.
11.13.2.1

Verifying the settings

Common test equipment can be used to determine the injection of current and voltage and
time measurement.
Verification of EAFACC & ERFACC output
1.
Connect the test set for injection of three-phase currents and three-phase voltage to the
appropriate current and voltage terminals of the IED.
2.
Ensure the instantaneous values of active and reactive power from CVMMXN function
block are connected to ETPMMTR function block active and reactive power inputs.
3.
Enable the
Bay control REC670
Commissioning manual
nd
order harmonic along with injected voltage signal.
2
to
6
for the harmonics until 5
EnaAcc setting and set tEnergy as 1 minute.
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
nd
rd
th
, 3
...5
)
th
order.
TestMode setting to Off .
Operation = On or Operation = Off and the
Section 11
IHD ,
GUID-17EC5D60-A748-46F4-8F13-A77E9CA3D17D v2
GUID-EDB51B29-9556-4EF4-94E6-5DC6B8C0F13A v1
SEMOD53588-1 v1
M13405-2 v7
GUID-4FC03017-93BD-4B30-A874-487BF89971D5 v1
GUID-F8F0D384-BC70-48CA-817E-EB9BFBD68A54 v3
183