Completing The Test; Instantaneous Residual Overcurrent Protection Efpioc - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
3 out of 3 currents are chosen for operation: Connect the symmetrical three-phase
If
injection current into phases L1, L2 and L3.
2.
Connect the test set for the appropriate three-phase voltage injection to the IED phases
L1, L2 and L3. The protection shall be fed with a symmetrical three-phase voltage.
3.
Block higher set stages when testing lower set stages by following the procedure
described below:
3.1.
3.2.
3.3.
4.
If the test has been performed by injection of current in phase L1, repeat the test,
injecting current into phases L2 and L3 with polarizing voltage connected to phases L2,
respectively L3 (
5.
If the test has been performed by injection of current in phases L1 – L2, repeat the test,
injecting current into phases L2 – L3 and L3 – L1 with the appropriate phase angle of
injected currents.
6.
Connect a trip output contact to a timer.
7.
Set the injected current to 200% of the operate level of the tested stage, switch on the
current and check the time delay.
For inverse time curves, check the operate time at a current equal to 110% of the operate
current for
8.
Check that all operate and start contacts operate according to the configuration (signal
matrixes).
9.
Reverse the direction of the injected current and check that the protection does not
operate.
2 out of 3 or 3 out of 3 currents are chosen for operation: Check that the function will
10.
If
not operate with current in one phase only.
11.
Repeat the above described tests for the higher set stages.
12.
Check that start and trip information is stored in the event menu .
11.4.2.2

Completing the test

continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.4.3

Instantaneous residual overcurrent protection EFPIOC

Prepare the IED for verification of settings outlined in Section
settings".
Values of the logical signals for EFPIOC are available on the local HMI under Main menu/Tests/
Function status/Current protection/InstResidualOverCurrent(50N,IN>>)/
EFPIOC(50N;IN>>):x, where x = 1, 2, and 3.
The Signal Monitoring in PCM600 shows the same signals that are available on the local HMI.
Bay control REC670
Commissioning manual
Set the injected polarizing voltage larger than the set minimum polarizing voltage
(default is 5% of
UBase ) and set the injection current to lag the appropriate voltage
by an angle of about 80° if forward directional function is selected.
1 out of 3 currents are chosen for operation: The voltage angle of phase L1 is the
If
reference.
2 out of 3 currents are chosen for operation: The phase angle of the phase-to-
If
phase voltage L1L2 is the reference for L1Phase.
3 out of 3 currents are chosen for operation: The voltage angle of phase L1 is the
If
reference.
If reverse directional function is selected, set the injection current to lag the
polarizing voltage by an angle equal to 260° (equal to 80° + 180°).
Increase the injected current, note the operate value of the tested step of the
function and compare it to the set value.
Decrease the current slowly, note the reset value and compare it to the reset ratio
95%.
1 out of 3 currents for operation).
txMin .
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
TESTMODE setting to Off .
"Preparing the IED to verify
Section 11
SEMOD56287-118 v4
SEMOD52967-3 v7
95