Completing The Test; Delta Supervision Of Real Input Delspvc; Verifying The Signals And Settings - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
Step No.
3-a
3-b
3-a
3-b
4.
Repeat Step
11.8.5.2

Completing the test

Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
11.8.6

Delta supervision of real input DELSPVC

Prepare the IED for verification of settings outlined in Section
settings".
11.8.6.1

Verifying the signals and settings

Make sure that the function is connected to any of the available real derived outputs, for
example the P output signal of the CMMXU function.
1.
Set the following parameters:
2.
Set a constant voltage input of UL1 = 63.5 V at 0° and UL2 = 63.5 V at 180° secondary and
a current signal at IL1 = 1A at 0° and IL2 = 1A at 180°.
3.
Ensure that the P output of CMMXU function has exceeded 10 MW and remains stable.
4.
Change the current signal at IL1= 2A at 0° and IL2= 2A at 180°. Both START and STARTRISE
signals should be active for 100 ms.
5.
Change the current signal at IL1= 1A at 0° and IL2= 1A at 180°. Both START and STARTLOW
signals should be active for 100 ms.
11.8.6.2
Completing the test
Continue to test another function or end the test by changing the
Restore connections and settings to their original values, if they were changed for testing
purposes.
Bay control REC670
Commissioning manual
OpMode
Changes after step 2
Instantaneous 1
cycle or
Instantaneous 2
cycle
Instantaneous 1
cycle or
Instantaneous 2
cycle
RMS or DFT Mag
RMS or DFT Mag
3
with IL2 changes for different mode.
Operation = ON
MinStVal = 10
DelSt> = 100
DeltaT = 7
tHold = 100
© Copyright 2017 ABB. All rights reserved
Change IL1 to 2 A
Change IL1 back to 1A
Change IL1 to 2 A
Change IL1 back to 1A
Testing functionality by secondary injection
Expected output
STL1 , STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
STL1, STRISE, START signal should be
TRUE for 100 ms
STL1 , STLOW, START signal should be
TRUE for 100 ms
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
TestMode setting to Off .
GUID-86ADAAC5-B6D3-46FE-A090-81F7C90A31A7 v1
"Preparing the IED to verify
GUID-8337C76B-A361-426E-B936-763105D85588 v1
GUID-2FE5E5F0-0E6C-499E-93D2-471C183B89BF v2
TestMode setting to Off .
Section 11
141

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents