Check Of Voltage Differential Trip And Alarm Levels - ABB Relion 670 Series Commissioning Manual

Bay control version 2.2 iec
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 403-UEN E
Check of U2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 28.
IEC07000107 V2 EN-US
Figure 28: Connection of the test set to the IED for test of U2 block level
where:
1
2
2.
Apply voltage higher than the highest set value of
three-phase inputs and to one phase of the U2 inputs according to figure 28.
The voltage differential START signal is set.
3.
Decrease slowly the voltage in phase UL3 of the test set until the START signal resets.
4.
Check U2 blocking level by comparing the voltage level at reset with the set undervoltage
blocking
11.5.4.2

Check of voltage differential trip and alarm levels

Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 29.
Bay control REC670
Commissioning manual
The connections to U1 must be shifted to test another phase. (UL1 to UL2,
UL2 to UL3, UL3 to UL1)
UL1
UL2
UL3
UN
is three-phase voltage group1 (U1)
is three-phase voltage group2 (U2)
U2Low .
© Copyright 2017 ABB. All rights reserved
Testing functionality by secondary injection
UL1
UL2
1
UL3
UN
UL1
2
UL2
UL3
IEC07000107-1-en.vsd
UDTrip , U1Low and U2Low to the U1
Section 11
SEMOD175258-91 v3
SEMOD175258-104 v3
125

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents