Toshiba ST-B10 Series Maintenance Manual page 76

Hide thumbs Also See for ST-B10 Series:
Table of Contents

Advertisement

5. DIAGNOSTIC TEST OPERATION
5.4.3.2 Touch Panel Test
When connecting the display unit equipped with the touch panel (LKBST-65, TFTST-56, TFTST-76, etc.),
whether to perform proper input through the touch panel and whether to indicate accurate input position are
checked in this test.
The test is applied for the touch panel controllers shown below.
(Whether the diagnostic test program supports the touch panel controller is distinguished automatically at the
Linux start-up time.)
• SMK touch panel controller:
• FUJITSU touch panel controller:
(1) Operation procedure
1. Select the Touch Panel Test(2) button on the Display Test Menu screen.
2. Trace the screen with your finger as you like and check if the traced line is displayed correctly.
3. When it is displayed correctly, click the OK button to terminate the test.
If not, click the NG button.
(2) Error code
Result
Error Code
1
-1
(3) Corrective action
If it is unable to input through the touch panel, this may cause a failure in the touch panel.
When the input portion is misaligned, perform a calibration.
<< Preliminary version >>
It is installed into the LKBST-65, TFTST-56, etc.
It is installed into the TFTST-76, etc.
Error Code Ex
0
0
0
Click the [OK] button to terminate the test.
0
Click the [NG] button to terminate the test.
5- 14
5.4 Serviceman Diagnostic Test Program
Remarks
EO18-12017

Advertisement

Table of Contents
loading

Table of Contents