Toshiba MJ-1104 Service Manual page 154

Table of Contents

Advertisement

(9)
Remove 2 screws, and then take off the gate
solenoid.
Note:
When installing the gate solenoid, install the
bracket with 2 screws as shown in the figure,
and then fix it at the position where the gap
between the gate flap and the shaft of the
entrance roller falls within 0.4 to 0.8 mm.
[H] Transport path switching solenoid (SOL5) (MJ-1104)
(1)
Take off the right upper cover.
 P.4-7 "[J] Right upper cover"
(2)
Take off the relay guide, feeding discharge
brush and right cover.
 P.4-7 "[K] Relay guide / Feeding dis-
charge brush / Right cover"
(3)
Remove 4 screws of the FIN board bracket.
MJ-1103/1104
DISASSEMBLY AND INSTALLATION
Bracket
B
A
A
B
© 2008, 2009 TOSHIBA TEC CORPORATION All rights reserved
4 - 86
Gate solenoid
Fig. 4-242
Gate flap
0.4mm to 0.8mm
Shaft of the entrance roller
Fig. 4-243
FIN board
bracket
Fig. 4-244

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mj-1103

Table of Contents