Toshiba MJ-1104 Service Manual page 157

Table of Contents

Advertisement

(13) Remove 2 screws, and remove the arm to
take off the transport path switching solenoid.
Notes:
When installing, perform adjustment for both
cases in which the solenoid is turned ON and
OFF.
1. When the solenoid is turned OFF, the gap
between the surface of the transport
guide and the upper side of the flap edge
must fall within 1.5 mm to 2.1 mm. Fix the
solenoid with 2 screws.
2. When the solenoid is turned ON, the gap
between the surface of the transport
guide and the upper side of the flap edge
must fall within 2.3 mm to 2.9 mm. Fix the
solenoid with 2 screws.
© 2008, 2009 TOSHIBA TEC CORPORATION All rights reserved
Arm
Transport path switching solenoid
Fig. 4-249
Surface of the
transport guide
1.5mm to
2.1mm
Fig. 4-250
2.3mm to
2.9mm
Surface of the
transport guide
Fig. 4-251
4 - 89
Upper side of
the flap edge
Upper side of
the flap edge
MJ-1103/1104
DISASSEMBLY AND INSTALLATION
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mj-1103

Table of Contents