Linking boards

10.2.2 Replacing the linking board

Field Replaceable Units (FRU)
Average task duration: 55 minutes

10.2.2.1 Required tools

Preliminary and concluding steps:
– Phillips PH2 / (+) No. 2 screw driver
Main steps:
– Phillips PH2 / (+) No. 2 screw driver

10.2.2.2 Preliminary steps

Perform the following procedures:
"Shutting down the server node" on page 41
Ê
"Removing the server enclosure out of the rack" on page 43
Ê
V
CAUTION!
For ALL service tasks, remove the CX400 S1 server enclosure out of
the rack and put it on a separate desk!
It is not allowed to draw the CX400 S1server enclosure partially out
of the rack.
"Removing the server node from the server enclosure" on page 48
Ê
"Opening the server enclosure" on page 51
Ê
"Removing the power supply module" on page 84
Ê
Ê Remove both fan modules as described in section
module" on page
"Removing the power distribution module" on page 54
Ê
"Removing the midplane" on page 153
Ê
166
137.
Upgrade and Maintenance Manual
"Removing the fan
CX400 S1