Chapter 2 Preparations
(4)
Installing the server in rack
1. Unlock the inner rails at both sides of server, and push the server into depths of rack.
2. Tighten the two screws that were loosened in Step 4 in (Pulling Out Server from Rack).
3. Cancel the maintenance mode. (See Chapter 3 (7.7.1 BMC – (7) Extended Functionality) for how to
cancel the maintenance mode. If the UID LED is on, turn off the UID LED using UID switch.
186
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
1. Installing / Removing Internal Options