NEC express5800 A2010b User Manual page 224

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

2. Installation and Connection
Chapter 2 Preparations
Rack nuts
4. Install the outer rail to the rack. Fix the outer rail with screws (2 positions at front side, and 2 positions at
rear side).
Rear side
Outer rail
Front side
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
224

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents