Chapter 2 Preparations
3. Release the locking mechanism of inner rail at both sides of server, and push the server into the depths
of rack.
4. Secure the server to the rack by two screws at front of the server. Secure the server to the rack nut
installed in Step 3 of "Installing the mount kit to the rack"
Screws (2 places)
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
2. Installation and Connection
227