NEC express5800 A2010b User Manual page 235

Hide thumbs Also See for express5800 A2010b:
Table of Contents

Advertisement

Chapter 2 Preparations
1. Make sure that the server is powered off and then disconnect the power cable or all interface cables from
the server. (If cable arm is mounted, remove it also.)
2. Make sure that proper earthquake-resistant construction is executed or stabilizers are mounted at front
bottom of rack to prevent from falling.
3. Remove the two screws at front of server.
4. Slowly pull out the server from rack until it is latched with clicks.
5. Slowly pull out the server from rails while unlocking the inner rails at both sides.
6. Hold the server firmly and remove it from the rack.
Screws (2 places)
Important
Be careful not to get your fingers caught in the rails or lever.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
2. Installation and Connection
235

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express5800 a1040bExpress5800 a2020bExpress5800 a2040b

Table of Contents