Commissioning
3.6 Commissioning U/f vector control booksize format for the first time
What?
7
Save the parame-
ters on the device
8
The motor
starts to run
Diagnostic functions in the STARTER commissioning tool
Under Component > Diagnostics > Control/status words
● Control/status words
● Status parameters
● Missing enable signals
142
How?
1. Select the drive unit in the project tree.
2. Call the "Connect target device" shortcut menu.
3. Call the "Target device > Load into the target device" context
menu.
The "After loading, copy the RAM to ROM" option is active.
Click "Yes" to confirm the backup.
Or
4. Call the "Target device > Copy RAM to ROM" shortcut menu.
The drives can be started via the control panel in the STARTER
commissioning tool.
Line/DC-link identification will be carried out once
the pulses for the infeed have been enabled and line/DC-link
identification has been activated. The infeed then switches in-
to the "Operation" state.
Once the pulses are enabled, a one-off motor data identifica-
tion run (if activated) is carried out.
When the pulses are enabled again, optimization with a rotat-
ing motor is carried out, if this is activated.
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5
Comment
Position the cursor on the
drive unit (SINAMICS
S120) and right-click.
For more information about
the control panel, see Get-
ting Started.
During motor data identifi-
cation, a current flows
through the motor, which
means that it can align
itself by up to a quarter of a
revolution.
For more information about
line / DC link / motor data
identification, see the
SINAMICS S120 Function
Manual Drive Functions.