Preparation for commissioning
2.1 Requirements for commissioning
2.1
Requirements for commissioning
The following are necessary for commissioning a SINAMICS S drive system:
● A programming device (PG/PC)
● STARTER commissioning tool
● A communication interface, e.g. PROFIBUS, PROFINET, Ethernet
● Completely wired-up drive line-up (see the SINAMICS S120 Manual)
30
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5