Siemens Sinamics s120 Commissioning Manual page 331

With starter
Hide thumbs Also See for Sinamics s120:
Table of Contents

Advertisement

Table 4- 40
Meaning of the OPT LED on the Control Unit
LED
Color
OPT
Green
Red
Orange
STARTER Commissioning Manual
Commissioning Manual, (IH1), 07/2016, 6SL3097-4AF00-0BP5
Status
Description, cause
OFF
The electronics power supply is missing or outside the per-
missible tolerance range.
CBE20 either defective or not inserted.
Continu-
CBE20 is ready and cyclic communication is taking place.
ous light
Flashing
CBE20 is ready but cyclic communication is not running.
light
Possible causes:
0.5 Hz
Communication is being established.
At least one fault is present.
Continu-
Cyclic communication via PROFINET has not yet been
ous light
established. However, non-cyclic communications are pos-
sible. SINAMICS is waiting for a parameteriza-
tion/configuration telegram.
Flashing
The firmware update into the CBE20 has been completed
light
with an error.
0.5 Hz
Possible causes:
The memory card for the control unit is defective.
The CBE20 is defective.
In this state CBE20 cannot be used.
Flashing
There is a communications error between the Control Unit
light
and the CBE20.
2 Hz
Possible causes:
The CBE20 was withdrawn after booting.
The CBE20 is defective.
Flashing
Firmware of the CBE20 currently being updated.
light
0.5 Hz
Diagnostics
4.1 Diagnostics via LEDs
Remedy
Correctly insert the
board, if required,
replace.
331

Advertisement

Table of Contents
loading

Table of Contents