Commissioning SINAMICS drives

8.6 First commissioning of SINAMICS drive ended

8.6
First commissioning of SINAMICS drive ended
First commissioning of SINAMICS drive completed
You have completed the first commissioning of the SINAMICS drives.
The unit configuration and parameterization has been completed successfully:
● All upper LEDs of the drives (SERVOs) are GREEN.
● The lower LEDs of the drives (SERVOs) are always YELLOW.
Continue with the steps for commissioning the NCK. You have chosen the "Commissioning"
operating area.
96
Commissioning Manual, 07/2007, 6FC5397-2AP10-3BA0
IBN CNC: NCK, PLC, drive