Table of Contents

Advertisement

Connections The modules must be mounted directly on the Mainboard, to the right of the release. In parallel
A4
X
XV
N
L1
L2
A1
K51
MEAS
XV
X
A4
166 | © 2013 ABB | 1SDH001000R0002 - L7804
they are connected to a connector, to which the phase and neutral voltages arrive on the
internal contacts of the circuit-breaker, or on the external sockets.
Information on the assembly is available from the web site http://www.abb.com/abblibrary/
DownloadCenter/, in particular with the kit sheet 1SDH001000R0505.
IMPORTANT: in the case of dielectric tests, you need to disconnect the modules
as illustrated in the assembly diagram, and to disconnect the external socket-
outlets from the terminal box. It is not necessary to remove the modules.
Wiring diagrams for the modules are provided below, with and without an isolation transformer:
61
71
81
91
01
51
HC
H1
H2
H3
H4
62
72
82
92
02
52
HC
K3
K4
K5
K6
64
74
84
94
04
54
HC
K7
K8
K9
K10
Q5..Q10
EKIP Signalling 4K
20
N
VN
V3
V2
V1
VN
V3
V2
V1
L3
L1 L2 L3
K51
MEAS
Diagrams 20 - 21 - 22 - 23
Further information is available on page 156, or on the site http://www.abb.com/abblibrary/
DownloadCenter/, where the wiring diagram is available 1SDM000091R0001.
95
35
R1
V3
Vn
Ge
Szi
96
36
U1
R2
V2
Rct
Ge-
Szo
98
38
U2
V1
Gzo
Szc
Gzi
S51
S33
M
YR
Trip Unit I/O
Module
21
PE
VN
V3
V2
V1
VN
V3
V2
V1
L1
L2
L3
K51
MEAS
Ne-
W3
K1
Ne
W4
K2
Rca
TU
Module
Module
EKIP Supply
I/O
22
N
L1
L2
L3
A1
L1 L2
L3
B1
A2
B2
A3
B3
E)
*
VN
V3
V2
V1
VN
V3
V2
V1
K51
MEAS
Electronic accessories | 2 - Ekip Measuring modules
ABB | SACE Emax 2
45
D1
C1
C11
C21
11
21
31
41
46
C3
C13
12
22
32
42
48
D2
C2
C12
C22
14
24
34
44
YU
RTC
YC
YO
YC2
Q1
Q2
Q3
Q4
YO2
23
TU1
a1
b1
a2
b2
a3
b3
VN
V3
V2
V1
VN
V3
V2
V1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents