ABB SACE Emax 2 Series Installation, Operation And Maintenance Instructions page 23

Table of Contents

Advertisement

19 | © 2013 ABB | 1SDH001000R0002 - L7804
Continued from the previous page
5. Make sure that signalling device indicates the DISCONNECT position. See Figure 38.
Figure 38
6. Grip the guide levers of the fixed part and push them until the moving part stops. See
Figure 39.
Figure 39
7. Extract the disconnection crank from its housing See Figure 40.
8. Press the lock push-button and insert the crank in the moving part. In this phase the
moving part is still in DISCONNECT position. See Figure 41.
Figure 40
Figure 41
Emax E2.2-E4.2-E6.2 circuit-breakers | 4 - Description
ABB | SACE Emax 2
1
2
Continued on the next page

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sace emax e2.2Sace emax e4.2Sace emax e6.2

Table of Contents